The U.S. Steel Tower needed to replace a 3 Ton fan that was installed when the building was originally constructed. The Q-Pac Fan Array provided a flexible solution that minimized downtime and the previous footprint.

Peters Township High School needed an HVAC system that would increase efficiency and redundancy while providing the ideal learning conditions for students and teachers.